TRANSITION DUCT R&O
Features:
Alpine Aerotech
Ltd. R&O Transition Ducts are fully engineered to
provide the best solution available on the market at an
affordable cost.
Your Transition Duct can be salvaged by embodying
repair schemes beyond the limits of the Structural
Repair Manual and Maintenance Manual. Incorporation of
minor fusion weld repairs is fully authorized.
A new one piece, stainless steel AFT Flange and/or
aluminum FWD Flange may be incorporated, which will
eliminate future damage typically associated with the
original equipment and installation.
-
Our new one piece,
stainless steel AFT Flange provides:
-
Our new one piece, aluminum FWD
Flange provides:
-
A flange that is clean and
flat
-
A flange with holes in the
correct location and size
-
A flange with no spot welds!
All R&O Transition Ducts are completely
refinished with a new conversion, primer and paint
coating to ensure hours of reliable, corrosion free
service
With lower turn times, we can R&O your
Transition Duct in approx. 5 working days!
R&O Transition Ducts
are supplied complete with
maintenance manual supplement, copies of TC & FAA
Approvals, certification and warrantied for a period of
1 year or 1000 hours of service (whichever comes first)
after date of purchase, on all workmanship and
materials. Stock item FOB Kelowna, BC.
Alpine Aerotech
Ltd. offers the finest lightweight helicopter
accessories and full customer support.
|
Models: |
Bell 212,
412, UH-1N |
|
|
Part
Numbers: |
LH
RH |
212-060-204-001
212-060-204-002 |
|
Approvals: |
Bell 212 &
412 |
CAN RDC:
P-RH04-017
USA RDC: P-RH04-017 |
| |
 |
 |
 |
|
|
Click on
photo for a larger view |
|
 |
|
|